 Thunder storms are building as train 215 readys to leave Cumbres
|
 CTS train 215 comes around Windy Point on its decent from Cumbres Pass
|
 The Sunset train is rounding Windy Point as it is almost to Cumbres Pass
|
 The engineer of 489 concentrates on his spot to stop the train at Cumbres
|
 K36 484 slows train 215 to a stop at the water plug at Cumbres
|
 The engineer looks back on the train as we climb rthe 4% grade to Cumbres.
|
 The climb continues as the 488 works hard to get the train up to Cumbres
|
 Train 215 is seen crossing the Rio do Los Pinos trestle as it heads toward Cumbres
|
 315 with freight at the bottom of Whiplash Curve
|
 488 in Antonito
|