![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
10 June 2007 - We have now sheathed the exterior walls. The window openings have been boarded over for the time being. The next job is to board over most of the door opening and to make and fit a temporary door. The exterior walls will then be weatherproofed enabling us to get on with demolishing the garage and building the new workshop/store in it's place.
Copyright © 2000 - 2018; "thesilvertops" All rights reserved.